跳至内容
菜单
此问题已终结
1 回复
7356 查看

Dear members,

In creating a manufacturing order i want to calculate the work center cost, as well as the labor cost with the materials cost, in order to have the full cost of the product.

Any one have an idea to do the right configuration? I'm using odoo 8

Thanks 

形象
丢弃
最佳答案

probably in v8 not possible. May be you can improve BOM cost structure report to calculate the total cost of components + workcenter cost.

形象
丢弃
相关帖文 回复 查看 活动
2
12月 24
1913
1
5月 24
2085
0
5月 24
1632
2
3月 23
2674
1
11月 22
4468