コンテンツへスキップ
メニュー
この質問にフラグが付けられました
1 返信
7394 ビュー

Dear members,

In creating a manufacturing order i want to calculate the work center cost, as well as the labor cost with the materials cost, in order to have the full cost of the product.

Any one have an idea to do the right configuration? I'm using odoo 8

Thanks 

アバター
破棄
最善の回答

probably in v8 not possible. May be you can improve BOM cost structure report to calculate the total cost of components + workcenter cost.

アバター
破棄
関連投稿 返信 ビュー 活動
2
12月 24
1953
1
5月 24
2125
0
5月 24
1677
2
3月 23
2732
1
11月 22
4530