İçereği Atla
Menü
Bu soru işaretlendi
1 Cevapla
7347 Görünümler

Dear members,

In creating a manufacturing order i want to calculate the work center cost, as well as the labor cost with the materials cost, in order to have the full cost of the product.

Any one have an idea to do the right configuration? I'm using odoo 8

Thanks 

Avatar
Vazgeç
En İyi Yanıt

probably in v8 not possible. May be you can improve BOM cost structure report to calculate the total cost of components + workcenter cost.

Avatar
Vazgeç
İlgili Gönderiler Cevaplar Görünümler Aktivite
2
Ara 24
1907
1
May 24
2081
0
May 24
1628
2
Mar 23
2669
1
Kas 22
4464