跳至內容
選單
此問題已被標幟

I need the ability to change the result of Work operations inside a Manufacturing order.


eg product d -> makes C -> makes B + A.

B then makes another product.


i want to be able to set out the whole operation inside a manufacturing order instead of having multiple MO for one product. 

Is this possible? is there an application that already does this?

頭像
捨棄
相關帖文 回覆 瀏覽次數 活動
0
2月 24
6
0
7月 23
1482
0
5月 23
1285
1
3月 25
1954
2
2月 25
2910