I need the ability to change the result of Work operations inside a Manufacturing order.


eg product d -> makes C -> makes B + A.

B then makes another product.


i want to be able to set out the whole operation inside a manufacturing order instead of having multiple MO for one product. 

Is this possible? is there an application that already does this?