跳至内容
菜单
此问题已终结
1 回复
77 查看

The Date (02/28/2025) you've entered isn't aligned with the existing sequence number (MISC/2025/09/0002). Clear the sequence number to proceed. To maintain date-based sequences, select entries and use the resequence option from the actions menu, available in developer mode.

形象
丢弃
最佳答案

The "09" in MISC/2025/09/0002 represents September.

Your entry is in February, so needs to have a sequence number like MISC/2025/02/xxxxx

Do what the error suggests and Odoo will reassign the correct sequence number, or manually edit it to have "02" instead of "09"

形象
丢弃