Within the implementation of the manufacturing module, I came across a detail, when trying to represent the duration of a manufacturing with a time of less than one second (1.41 seconds, for example) the system rounds to seconds (2 seconds) and therefore calculates wrong manufacturing times, try to use the efficiency percentage, however this calculation is not viable for me, since there are more than 100 different durations and that without considering adding more BOM's later.

Really, I hope someone has some suggestions, since in my opinion, it could only be through a code adjustment, which is really undesirable at this point.

Thanks in advance.