Within the implementation of the manufacturing module, I came across a detail, when trying to represent the duration of a manufacturing with a time of less than one second (1.41 seconds, for example) the system rounds to seconds (2 seconds) and therefore calculates wrong manufacturing times, try to use the efficiency percentage, however this calculation is not viable for me, since there are more than 100 different durations and that without considering adding more BOM's later.
Really, I hope someone has some suggestions, since in my opinion, it could only be through a code adjustment, which is really undesirable at this point.
Thanks in advance.
Odoo is the world's easiest all-in-one management software.
It includes hundreds of business apps:
- إدارة علاقات العملاء
- e-Commerce
- المحاسبة
- المخزون
- PoS
- Project
- MRP
لقد تم الإبلاغ عن هذا السؤال
1876
أدوات العرض
هل أعجبك النقاش؟ لا تكن مستمعاً فقط. شاركنا!
أنشئ حساباً اليوم لتستمتع بالخصائص الحصرية، وتفاعل مع مجتمعنا الرائع!
تسجيلالمنشورات ذات الصلة | الردود | أدوات العرض | النشاط | |
---|---|---|---|---|
|
2
يناير 23
|
2739 | ||
|
0
نوفمبر 21
|
3015 | ||
|
1
يونيو 21
|
1610 | ||
|
1
سبتمبر 20
|
2456 | ||
|
1
أغسطس 19
|
3148 |