Перейти к содержимому
Меню
Чтобы взаимодействовать с сообществом, необходимо зарегистрироваться.
Этот вопрос был отмечен
1 Ответить
5932 Представления

I have 3 warehouses A, B, C.

I move the goods from warehouse A, B to the Transit Location of warehouse C. I configure for the Rule for the Transit Location of warehouse C to be Push to(When products arrive in C/TransitReceipts are created to send them in C/Stock.). When I check the receipts from Transit to C warehouse, it only takes a receipt for all the products from warehouse A and warehouse B without Source Document.

Who can help me to divide into 2 receipts after Transit push to Stock's Warehouse C: a receipt for goods from A (Soure Document ex: A / OUT / 0001) and a receipt for goods from B (Soure Document ex: B / OUT / 0002).

Thank you very much!

Аватар
Отменить

Have you found a answer to that issue?

Лучший ответ

You should select / create an Operating Type of type "Internal" and use it for your internal transfer from one warehouse to another.

Hope you got it

Аватар
Отменить
Related Posts Ответы Просмотры Активность
1
мар. 25
5045
2
авг. 25
839
2
июл. 24
2255
4
мая 24
13253
1
апр. 24
3773