تخطي للذهاب إلى المحتوى
القائمة
لقد تم الإبلاغ عن هذا السؤال
1 الرد
5929 أدوات العرض

I have 3 warehouses A, B, C.

I move the goods from warehouse A, B to the Transit Location of warehouse C. I configure for the Rule for the Transit Location of warehouse C to be Push to(When products arrive in C/TransitReceipts are created to send them in C/Stock.). When I check the receipts from Transit to C warehouse, it only takes a receipt for all the products from warehouse A and warehouse B without Source Document.

Who can help me to divide into 2 receipts after Transit push to Stock's Warehouse C: a receipt for goods from A (Soure Document ex: A / OUT / 0001) and a receipt for goods from B (Soure Document ex: B / OUT / 0002).

Thank you very much!

الصورة الرمزية
إهمال

Have you found a answer to that issue?

أفضل إجابة

You should select / create an Operating Type of type "Internal" and use it for your internal transfer from one warehouse to another.

Hope you got it

الصورة الرمزية
إهمال
المنشورات ذات الصلة الردود أدوات العرض النشاط
1
مارس 25
5043
2
أغسطس 25
838
2
يوليو 24
2252
4
مايو 24
13252
1
أبريل 24
3773