跳至內容
選單
此問題已被標幟
3913 瀏覽次數

I struggling this case, i have a product bill of material and manufacturing order, after 2 months i want to revised this bill of material and save some changes here. at the same time I add 2 more product for this product(BOM), if i selecting manufacturing order means case 2 will come, case 1 is not working how? any other methods are there for Multi BOM.

Regards Sridharan G

頭像
捨棄
相關帖文 回覆 瀏覽次數 活動
2
8月 25
847
2
8月 24
4437
1
3月 24
2095
2
6月 21
3347
0
3月 21
2097