Hallo Everyone,

I have the following setup

ProductA can be produced by using MaterialA as input. MaterialA is defined in BOM. Both ProductA and MaterialA have real time accounting enabled with same input,output&valuation accounts. An income and an expense account is also added for both products.

MaterialA goes through a machine and two human workceters. Worktime, Capacity, hour cost, hour account and analytic journal has been defined for all three workcenters. Cycle cost has not been defined as i am using hours as unit.

When i create a MO directly or from a SO, I can see in workorders, the proper hours required calculated. It takes into account the whole routing (workcenter 1 through 3). But when I produce the product, no analytic entries are found in the analytic journal.

What am I missing here ? Any help is greatly appreciated.

I am using odoo 8.

Thanks a lot in advance