跳至內容
選單
此問題已被標幟
1387 瀏覽次數

We are a print company and need to produce final printed products in square foot increments. If we were producing 1 sq foot of a final product the set up, and final take down would be the same no matter the size of material the only changes would be print time and the cost associated with that.

We would like a way to account for the different print times, ink needs, and material needs based on sq footage while also keeping our set up, take down and transfer between work centers static in cost instead of being added to cost with each square foot produced. 

頭像
捨棄
相關帖文 回覆 瀏覽次數 活動
2
8月 19
4643
2
9月 23
7256
4
5月 25
51765
6
12月 23
47033
3
10月 21
19182