Picking components in the warehose before manufacturing a product does take time. The value of this time is part of the products cost. Same thing with packing. The packing material used can be put in the BOM but where to put the picking and packing time? If one adds time to the routing for picking and packing that will multiply for each product manufactured, so... Can picking and packing be performed by modified working centers? Can costing be added to other operation types than manufacturing?
Odoo is the world's easiest all-in-one management software.
It includes hundreds of business apps:
- CRM
- e-Commerce
- Kế toán
- Tồn kho
- PoS
- Project
- MRP
Câu hỏi này đã bị gắn cờ
If you treat as an operation in manufacturing, then you would assume that this is a direct cost to the manufacturing - e.g. depends on the number of products being produced. It's reasonable, because it's not the same pick/pack effort to manufacture 100 than 1000 in a manufacturing order.
If you consider that the pick/pack is not really depending on the volume being manufactured, then I would understand that you are starting to understand it as an indirect cost to the manufacturing process. In that case you could capture the cost as it is produced (each time a transfer is completed you record the cost), and then you would need to allocate the cost afterwards to each manufacturing order according to some cost distribution criteria.
If you were able to capture, in each pick/pack transfer, what manufacture is it for, then you would be able to do this cost allocation easily.
Bạn có hứng thú với cuộc thảo luận không? Đừng chỉ đọc, hãy tham gia nhé!
Tạo tài khoản ngay hôm nay để tận hưởng các tính năng độc đáo và tham gia cộng đồng tuyệt vời của chúng tôi!
Đăng kýBài viết liên quan | Trả lời | Lượt xem | Hoạt động | |
---|---|---|---|---|
|
2
thg 9 18
|
6129 | ||
|
1
thg 11 17
|
6114 | ||
Sharing BoM in multi-company setup
Đã xử lý
|
|
4
thg 1 25
|
7223 | |
|
4
thg 5 24
|
3998 | ||
|
0
thg 7 23
|
2141 |