İçereği Atla
Menü
Bu soru işaretlendi
3629 Görünümler

The warning "You should provide a lot for the final product" blocks work order production, as "Done" is pressed.

A final product is tracked by Lot. In Manufacturing order the finished product has a registered lot.  What do I miss?

I presume, that the finished product in MO and the final product are the same thing.

Regards, Alexander      

Avatar
Vazgeç
İlgili Gönderiler Cevaplar Görünümler Aktivite
2
Tem 25
574
0
Ara 17
5380
1
Eyl 25
743
2
Eyl 25
329
2
Eyl 25
362