There are occasions when we have a Product in stock that needs to be reworked due to manufacturing issues. 


Example: Product 1 is the wrong diameter. We need to put it into our workshop to turn it on a lathe, then return it to stock. We want to record the additional cost of rework labour on the component cost. 


Attempt 1:

Initially I thought, we could make an MO to produce "Product 1". On the BOM we would have "Product 1" + Operation "Turn on Lathe". This doesn't work as a product cannot reference itself on a BOM.


Attempt 2:

Then i tried Repair module. I created a repair order, with "Product 1" as product to repair. 

The "location" i used was our stock location for this part. 

I added parts to the RO, creating a storable product called "Remedial". "Remedial" was created so we can create an MO to create operation "Turn on Lathe" and record time against this operation. 

I completed the MO to create the quantity of "remedial" required in stock for the RO. The cost of "remedial" was £1 per unit.

I completed the RO and everything went through correctly, "remedial" was consumed and "Product 1" moved from WH/Stock to WH/Stock

The issue is, no additional cost was added to "Product 1", it remains at the original cost and the £1 per unit from the "remedial" component is not added. 


Am I missing something? is there a proper way to deal with remedial work of this kind? are there any suggestions?


regards


Graeme




อวตาร
ละทิ้ง
Related Posts ตอบกลับ มุมมอง กิจกรรม
Blank BoM not sending MO to draft แก้ไขแล้ว
3
ก.ย. 25
1873
2
ส.ค. 25
7655
3
มิ.ย. 25
3751
0
พ.ย. 24
1528
1
ต.ค. 24
1824