Skip to Content
Menu
Musisz się zarejestrować, aby móc wchodzić w interakcje z tą społecznością.
To pytanie dostało ostrzeżenie
2 Odpowiedzi
2459 Widoki

The documentation talks about semi-finished products.


https://www.odoo.com/documentation/15.0/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.html


But what if you want to use such 'composite' boms at a subcontractor.


Say i have a product 'Steel table', it consists of legs and a table top. So it is a BoM, subcontractor, and i supply the products to my subcontractor. All is fine.


Now i want to also create a product "Painted steel table" with 3 colors.

So i create a BoM for these variants. With a steel table inside and the product has the cost for the spray painting.


Now the subcontractor can 'prepare' steel tables. and when an order comes in for a 'blue' one, it can take one from its stock and spray paint it.


I don't manage to this to work automatically. So when i order a 'steel table colored blue' it will automatically make a subcontractor/manufacturing order for the normal steel table, in case there are none in stock with the subcontractor location.

Awatar
Odrzuć
Najlepsza odpowiedź

You may want to refer to a recent post on multi-level BOMs at sub-contractor location and apply these concepts to configure inventory routes and operations specific to your business flows and your products.

https://www.odoo.com/forum/help-1/how-to-configure-multi-levels-of-boms-at-the-subcontractor-s-location-200188

Awatar
Odrzuć
Najlepsza odpowiedź

   HI 

Can you clarify the automation you need in this issue 

Awatar
Odrzuć
Powiązane posty Odpowiedzi Widoki Czynność
1
sie 22
4343
1
maj 22
2803
2
lip 18
3131
1
maj 25
1690
3
maj 25
2989