콘텐츠로 건너뛰기
메뉴
커뮤니티에 참여하려면 회원 가입을 하시기 바랍니다.
신고된 질문입니다
1 회신
1839 화면

I know I can manufacture products using one, two, or three steps.

Can I change my mind?

How does a change after I have started impact things?

아바타
취소
베스트 답변

Yes.

The number of steps in Manufacturing can be changed at any time - always working forward - meaning the change will come into effect on the NEXT Manufacturing Order(s).

You can change at any time, or even enable all three* and configure Odoo to use one option per Warehouse, Product Category or Product.


*to enable all three:

  • configure for 3 steps
  • duplicate the 3 step Route
  • configure for 2 steps
  • duplicate the 2 step Route
  • configure for 1 step
  • rename Routes as needed
  • set them up to be selectable on the Warehouse, Product Category, or Product

Note that if you ever select multiple steps on a Warehouse / Category / Product, Odoo will choose the highest in the list of Routes (you can drag Routes in the Routes Menu, Odoo starts from the top and works down until it finds the first Manufacturing Route if you have multiple options selected).



아바타
취소
관련 게시물 답글 화면 활동
1
12월 20
6101
2
7월 24
2694
1
2월 24
3053
1
11월 21
3797
0
3월 15
6613