コンテンツへスキップ
メニュー
この質問にフラグが付けられました
4764 ビュー

Hi, I'm trying to configure manufacturing of a batch of product where the finished product is placed into containers of a specific size. Is there a way to model this ? 

The other thing I need to model is that some batches do not produce exactly full containers, and these incomplete batches are occassionally combined to produce a full container. How can this be modelled / configured ?

Thanks.

アバター
破棄
関連投稿 返信 ビュー 活動
2
6月 24
7666
1
9月 25
836
2
9月 25
413
2
9月 25
414
4
9月 25
505